Nightpeak announced on October 13 that its Bocanova 2 battery-storage facility in Texas began commercial operation on September 17. Using Tesla Megapack 2 XL units, the new phase supplies 150 MW for two hours, or about 300 MWh, while the combined site reaches 300 MW. It is intended to respond to fluctuations in demand and renewable generation on the ERCOT grid. The new facility alone is not 300 MW, and installed capacity does not establish actual utilization or profitability.