SkyPilot argues that scheduling GB200 and GB300 NVL72 systems requires awareness of intra-rack connections and failure reserves, not just GPU counts. In a cited model with 2% of nodes unavailable across 128 racks, using 16 nodes plus two spares per rack instead of requiring all 18 increases usable nodes from 1,602 to 2,037, about 27%. That is not a speedup of individual GPUs. In a separate GR00T N1.7 experiment on 512 GB300 GPUs, rack-aware placement improved throughput by 14.4% over arbitrary placement. NVIDIA’s Slurm guidance likewise emphasizes rack boundaries and topology constraints. Operators need to consider model size, communication paths and whether jobs can safely restart.